Skip to content

Fort Myers, Florida / Roadwork · Drainage · Concrete

Subcontractor Bid Room (239) 841-6400

STA 0+00  ·  BEGIN

Aerial view over the Buckingham Road corridor and roundabout in Lee County

Project photos · Field collection

Construction Project Photos From the Field

Construction project photos show details that are easier to understand in the field than in a short service description. Browse V&H Construction’s image collection for a closer look at infrastructure work, then use the service pages to explore the type of construction relevant to your project.

Call (239) 841-6400 or invite V&H to bid to discuss work shown in your plans.

Invite V&H to Bid →Field Videos

STA 1+00  ·  COLLECTION

Explore the Construction Project Photos

When viewing a photograph, read the caption alongside it. The subject, location, and stage of work give the image its context. A close-up can show one construction element, while a wider view helps explain how it sits within the surrounding work area.

The activity in a photograph is a moment in a project. If you want to discuss a particular view, mention its caption or title when contacting us.

All work

Roadwork

Drainage

Concrete

25  /  views shown

Completed Buckingham roundabout from V&H's drone footage, aerial view

Roadwork · Buckingham roundabout · Aerial

Completed roundabout from V&H's drone footage

Excavators setting drainage pipe and structures in an open trench beside a road in Hendry County, aerial view

Drainage · Hendry County · January 2026

Drainage structure and pipe installation in open excavation

Newly placed concrete sidewalk along Clifford Street in Fort Myers, with V&H Construction silt fence in the foreground

Concrete · Clifford Street · Fort Myers

New concrete sidewalk placed along Clifford Street

Aerial view of Gillot Blvd at the Blitman Waterway under reconstruction, with equipment and materials staged on the approaches

Roadwork · Gillot Blvd · Charlotte County

Gillot Blvd reconstruction at the Blitman Waterway, July 2025

Completed Gillot Blvd crossing at the Blitman Waterway with new guardrail and paved roadway, aerial view

Roadwork · Gillot Blvd · Complete

Completed Gillot Blvd at the Blitman Waterway, September 2025

Existing overgrown pipe outfall on Burnt Store Road before reconstruction

Drainage · Burnt Store Road · Before

Existing pipe outfall on Burnt Store Road before reconstruction

Crew building headwall formwork inside a shored, dewatered excavation beside Burnt Store Road

Drainage · Burnt Store Road · Formwork

Headwall formwork in a shored, dewatered excavation beside Burnt Store Road

New concrete headwall and pipe outfall with riprap slope protection on Burnt Store Road

Drainage · Burnt Store Road · Complete

New concrete headwall and outfall with riprap slope protection on Burnt Store Road

Timber formwork for a concrete approach beside the Bell Blvd pedestrian bridge

Concrete · Bell Blvd · Bridge approach

Formwork for a concrete approach to the Bell Blvd pedestrian bridge

Steel pedestrian bridge spans staged beside Bell Blvd with a crane positioned for placement over Jim's Canal

Bell Blvd · Pedestrian bridge · July 2026

Steel pedestrian bridge spans staged for placement over Jim's Canal

Completed roundabout with adjacent curb, gutter and drainage work

Roadwork · Curb & gutter · Drainage

Completed roundabout with adjacent curb, gutter and drainage work

New sidewalk and white steel pedestrian bridge over Jim's Canal beside Bell Blvd in Lehigh Acres, aerial view

Concrete · Bell Blvd · Complete

New sidewalk and pedestrian bridge over Jim's Canal, Lehigh Acres, September 2026

Completed steel pedestrian bridge spanning Jim's Canal

Bell Blvd · Pedestrian bridge · Complete

Completed steel pedestrian bridge over Jim's Canal

Pedestrian bridge alongside the Bell Blvd roadway bridge over Jim's Canal

Bell Blvd · Pedestrian bridge · Complete

Pedestrian bridge alongside the Bell Blvd roadway bridge

Buckingham roundabout site in early construction with drainage pipe staged along the alignment

Roadwork · Buckingham roundabout · Early stage

Early construction, with drainage pipe staged along the new alignment

Buckingham roundabout with the central island planted and paving underway

Roadwork · Buckingham roundabout · Paving

Central island planted and paving underway

Aerial view of the Buckingham roundabout with splitter islands and approaches taking shape

Roadwork · Buckingham roundabout · Lee County

Roundabout, splitter islands and approaches taking shape, October 2025

Aerial progress photo of the Buckingham Rd and Gunnery Rd roundabout during earthwork, August 2025

Roadwork · Buckingham roundabout · August 2025

Roundabout earthwork and base construction under way — photo: FAST Aerial Services

Aerial progress photo of the Buckingham roundabout with the central island planted and pavers in place, October 2025

Roadwork · Buckingham roundabout · October 2025

Central island planted, with splitter islands and pavers in place — photo: FAST Aerial Services

Aerial progress photo of paving and curb work around the Buckingham roundabout, November 2025

Roadwork · Buckingham roundabout · November 2025

Paving and curb work continuing — photo: FAST Aerial Services

Aerial progress photo of traffic moving through the Buckingham roundabout area during construction, January 2026

Roadwork · Buckingham roundabout · January 2026

Traffic moving through the roundabout area during construction — photo: FAST Aerial Services

Aerial progress photo of the Buckingham roundabout and its approaches shortly before opening, February 2026

Roadwork · Buckingham roundabout · February 2026

Final approach and landscaping work shortly before opening — photo: FAST Aerial Services

Completed concrete-lined drainage structure with restored ground beside a street in Hendry County, aerial view

Drainage · Hendry County · Complete

Concrete-lined drainage structure and restored ground, March 2026

Completed roundabout island with palm landscaping and decorative paving

Roadwork · Detail · Roundabout island

Completed roundabout landscaping — palm island, decorative curb and paving

Completed Buckingham roundabout with colored pavement, crosswalks and a landscaped central island, aerial view

Roadwork · Buckingham roundabout · Complete

Completed Buckingham Rd & Gunnery Rd roundabout, March 2026

About these photos

Every photograph in this collection shows V&H project work, from early excavation through completed construction. Captions name the project where it is known, the type of work, and when the view was taken. Aerial progress photos of the Buckingham roundabout are by FAST Aerial Services and used with permission. Select any photo to view it larger.

STA 2+00  ·  SERVICES

STA 3+00  ·  MOTION

See Construction in Motion

Our field videos offer a different way to view activity on site. For company information, visit About V&H, or return to the services overview to compare the three main categories.

We’re based in Lehigh Acres, just east of Fort Myers, and welcome inquiries for Southwest Florida infrastructure projects. Share the location and the relevant drawings when you introduce an opportunity. For general questions, contact our team.

STA 4+00  ·  SEND

Route A  ·  Owners, GCs & developers

Discuss the Construction You Need

Share the location and the relevant drawings when you introduce an opportunity. For general questions, contact our team.

Call (239) 841-6400 or send your project details to discuss the construction you need.

Send project details →(239) 841-6400

Route B  ·  Subcontractors & suppliers

Bidding with us

Subcontractors and suppliers have a separate inquiry route through the bid room.

Enter the bid room → Contact →